Santa Rosa Correctional Institute
Architectural
Architectural
- Tindall engineers converted existing prototype concrete block construction (CMU) to total precast construction
- Tindall’s total precast solution was more cost efficient and faster than CMU, lowering Florida DOC’s general costs and reducing overhead
- Each double-cell module included two 92-sq.-ft. cells with rear access, fully upfitted MEP chase
- Partnering with Prison Rehabilitative Industries and Diversified Enterprises (PRIDE), Tindall factory-installed inmate-fabricated metal bunks in each cell





